Whether you are a developer, an agent or an individual seeking planning approval, if your development is 100m² or more of construction area you will require sustainable drainage to manage on-site surface water (whether you require planning permission or not). These SuDS must be designed and constructed in accordance with the Welsh Government Standards for Sustainable Drainage and you must seek SAB approval independently from your planning approval. Construction can only begin once the 2 permissions have been granted.
Existing developments/construction work with planning permission granted or deemed to be granted (whether or not subject to any conditions as to a reserved matter) or for which a valid application has been received but not determined by 7 January 2019, are not required to apply for SAB approval.
However, SAB approval will still be required if the planning permission was granted subject to a condition as to a reserved matter and an application for approval of the reserved matter is not made before 7 January 2020.
Surface water drainage systems must be designed and built in accordance with the Statutory Standards for Sustainable Drainage, which can be found here: SuDS Statutory Standards
Construction Work: A Definition
Under Schedule 3 of the Flood and Water Management Act 2010, construction work is defined as anything done by way of, in connection with or in preparation for the creation of a building or other structure. Construction work has drainage implications if the building or structure will affect the ability of land to absorb rainwater.
Note: anything that covers land (such as a patio or other surface) is classed as a structure for the purposes of SAB approval.
If you are in any doubt as to whether you require SAB approval, please contact us.